Custom software project cost planning in Bangladesh

A cost model for custom software: discovery, delivery, integrations, data, contingency and the whole-life support budget.

E
EncryptTechBD · 0 comments
Business handshake
Photo: Kristin Hardwick / StockSnap

Asking "what will this software cost?" before defining the scope is like asking a builder for the price of a building without saying how many floors it has. The answer is either a guess or a sales number. A useful budget is built from scope, uncertainty and the cost of running the system after launch.

This guide gives you a cost model, a calculator structure you can put in a spreadsheet and the questions that expose an incomplete proposal. It does not publish a fixed price, because a credible price depends on the work.

Why a single number is a bad plan

A custom software project has four kinds of cost, and most quotes cover only the second:

  1. Discovery: understanding the process, users, data and constraints.
  2. Delivery: design, build, test and launch the first version.
  3. Change: the work that appears when real users touch the system.
  4. Run: hosting, support, upgrades and internal ownership after launch.

A quote that covers delivery but not discovery is an estimate built on assumptions. A quote that covers launch but not run is a first-year price, not a budget.

The cost model

Build the estimate from lines, each with an owner and a range.

  • Discovery and requirements: interviews, process maps, scope document, acceptance criteria. Price it as a defined phase.
  • Product and UX design: screens, states, permissions and mobile behaviour. More screens and roles mean more design work.
  • Engineering: person-weeks by role, multiplied by a blended rate. Senior time costs more but usually reduces rework.
  • Quality assurance: test cases, automation, regression and user acceptance support. Do not treat this as optional.
  • Project management and business analysis: coordination, decisions, change control and reporting.
  • Integrations: each external system has its own access process, sandbox, limits, error handling and approval. Count them individually.
  • Data migration: extraction, cleanup, mapping, import, reconciliation and rollback.
  • Infrastructure and licences: hosting, database, storage, email, SMS, maps, payment or AI usage.
  • Security and compliance: authentication, permissions, logging, backups, privacy review and testing.
  • Training and documentation: admin guide, user guide, handover sessions and a support model.
  • Contingency: a percentage agreed with finance, with a written statement of what it covers.
  • Post-launch support: a monthly retainer or an internal budget for fixes and small changes.

A calculator you can build in a spreadsheet

Use a three-point estimate for each delivery line: optimistic, likely and pessimistic. The weighted estimate is:

weighted = (optimistic + (4 x likely) + pessimistic) / 6

Then calculate the project total:

total = discovery + (delivery person-weeks x blended rate) + fixed costs + contingency

And the monthly run cost:

run = hosting + licences + support + internal admin time

Keep the inputs visible. A spreadsheet with a single total hides the assumptions that matter: number of roles, integrations, migrated records and the confidence of the estimate. When a vendor gives you a number, ask them to fill in the same lines. If they cannot, the comparison is not like for like.

Contingency and change control

Contingency is not a secret buffer. It is the budget for things you know are uncertain: an API that behaves differently from its documentation, data that is dirtier than expected, or a policy decision that arrives late.

  • Agree the percentage with finance and state what it covers.
  • Keep a change log with the request, impact on scope, cost and date, and the approver.
  • Review changes monthly, not at the end of the project.
  • Separate defect fixes from new scope. A defect is included; a new rule is a change.
  • Set a threshold above which a change needs owner approval.

Projects rarely fail because of one large change. They fail because twenty small ones were absorbed silently and the original date became fiction.

Whole-life cost

Plan for three years, not one. Include:

  • Hosting and infrastructure growth.
  • Licence and usage increases.
  • Security patching and dependency upgrades.
  • Support and small enhancements.
  • Internal product ownership: someone must prioritise, test and approve.
  • Training for new staff and branches.
  • Exit or migration costs if the vendor relationship ends.

A system that is cheap to build but expensive to change is not cheap. The internal owner time is often the largest hidden line, especially in a company where the same manager also runs operations.

Questions to ask a vendor

  • What is included in discovery, and what will we have at the end of it?
  • Which roles, integrations and reports are in the fixed scope?
  • What is explicitly excluded?
  • Who owns the code, designs and data?
  • How do you test, and can we see the test evidence?
  • What happens when a third-party API changes or is unavailable?
  • How do you handle data migration and reconciliation?
  • What is the change request process and who approves it?
  • What does support cost after the warranty period?
  • Can we export our data and continue with another team?

A 90-day planning cycle

  1. Weeks 1-2: map the process, users, exceptions and data sources.
  2. Weeks 3-4: write the scope and acceptance criteria; count roles and integrations.
  3. Weeks 5-6: request estimates on the same line items and compare assumptions.
  4. Weeks 7-8: check references, security practice and support model; agree the contract shape.
  5. Weeks 9-10: run a paid discovery or a narrow pilot if the risk is high.
  6. Weeks 11-12: approve the budget, contingency and run cost; set the first review date.

Metrics for the project

  • Estimate accuracy: actual cost divided by the approved estimate.
  • Change cost as a share of the original budget.
  • Defects found after launch, by severity.
  • Cycle time from approved change to release.
  • Adoption: active users against the intended user group.
  • Uptime and support ticket volume after launch.

Where this fits

If you need a scoped build rather than an open-ended hourly arrangement, start with Custom Software & Integrations. The pricing page explains how discovery, delivery and support are separated. For the annual budget view, read how to plan an SME IT budget.

Sources

Services that deliver this

Want this implemented properly?

Pricing →

Every engagement starts with a written scope. If a requirement is outside it, we quote it separately before starting.